Gbetu TV (News They Are Not Talking About)
News

Edo Flooding: Govt assures on timely completion of water detention pond project

The Edo State Government has assured residents of Benin City on timely completion of water detention pond projects to check flooding in the state.

 

Edo Permanent Secretary, Ministry of Environment and Sustainability, Mr. Lucky Wasa, gave the assurance after inspecting the water detention pond in Erediauwa axis of Benin City.


He said the state government appreciates the patience of the residents in the area and understands the difficulties they go through as a result of the ongoing stormwater project, noting, “We urge you all to be patient with us. The state government is already doing something about the issue. Our consultants are already working to correct the flooding problem in the area.

 

Noting that work has reached advanced stage on some of the detention ponds on the axis, he said the government is committed to ensuring that the erosion control scheme is all-encompassing.

Permanent Secretary, Ministry of Environment and Sustainability, Mr. Lucky Wasa, during his inspection of water detention pond at Erediauwa in Benin City, on Wednesday, June 24, 2020.

On the new projects in the area, he said, “The consultants have commenced engineering design and are working on the drawings. They are already at the final stage. Soonest the design will be completed and we will commence work on the project immediately. All of these will be a thing of the past. We sincerely appeal for more patience from the people resident in this locality.”


He added, “We will appeal to those that are building on waterways and the Benin Moat to desist from such because that is one of the major causes of the flooding. Some people are bent on building on waterways and the moat. This is why we are here with the Ministry of Physical Planning and Urban Development to move round and check houses built on waterways. We will ensure necessary action is taken to correct the anomalies.

 

One of the residents in the area, Mr. Monday Uho, said the moat in the area was blocked, which hindered free flow of the water in the area, which eventually led to flooding.

Edo Flooding: Govt assures on timely completion of water detention pond project
__________________________ Join us on WhatsApp ______________________________
Tags: Edo State Mr. Lucky Wasa
FADAKA LOUIS

Recent Posts

  • Education

JAMB set to release 2024 UTME results

The Joint Admissions and Matriculation Board (JAMB) has concluded plans to release the results of the 2024 Unified Tertiary Matriculation…

29 April 2024
  • Health

Why drinking cold water is dangerous, even in hot weather

Cardiologists and public health physicians have warned Nigerians against excessive consumption of cold water, stressing that it can lead to…

29 April 2024
  • Technology

China’s robotic spacecraft to be sent to the moon

The Chang’e 6, China’s next robotic spacecraft to the moon, has been scheduled to set out on its journey in…

29 April 2024
  • Education

Lagos Indian school where Nigerians are denied admission

Gbenga Oloniniran writes about the discrimination experienced by some Nigerians on the premises of foreign businesses where they are met…

29 April 2024
  • Technology

NASA is officially headed to Saturn moon

It's scientifically ambitious. It's aeronautically daring. And it's unflinchingly expensive. It's NASA's newly approved mission to Saturn's moon, Titan, where…

29 April 2024
  • Politics

Mali: Political parties call for presidential elections to end military transition

Since the coup d’état on May 24, 2021, a transition government has been in charge of Mali and shows no…

29 April 2024