Gbetu TV (News They Are Not Talking About)

PMB at WORK: HOW ITAKPE-WARRI RAIL WAS BROUGHT TO LIFE, 30 YEARS AFTER


The work of President Muhammadu Buhari must not be ignored as his goverment brought back to life the Itakpe-Warri Rail back after 30years.

The Itakpe-Warri Rail Line runs from Itakpe in Kogi State, first to Ajaokuta, also in Kogi, and then across Kogi, Edo and Delta States, terminating in Warri, Delta State. It was conceived more than 30 years ago to connect Nigeria’s Iron Ore Mining and Steel Production belt (Iron Ore Mining Company in Itakpe, Ajaokuta Steel Company, and Delta Steel Company in Aladja, Warri), and also link it to the Warri Port.

(adsbygoogle = window.adsbygoogle || []).push({});

Most of the track laying was done under the Babangida Administration (he commissioned the Itakpe-Ajaokuta leg, and laid the foundation for the Ajaokuta-Warri leg) and then subsequently abandoned. There were efforts and moves to restart and complete it under subsequent administrations, but no real progress was made, until the Buhari Administration took over, and decided to prioritize it as part of the National Rail Modernisation Programme.

Work finally resumed onsite around August/September 2017, and has continued since then, focusing on

– the rehabilitation and modernization of the tracks already laid more than two decades ago (parts of it vandalised over the years);

– completion of track laying (the Ajaokuta-Warri stretch had apparently never been completed).

– construction of a modern Railway Village & Maintenance Yard in Agbor

– construction of passenger Stations (12 in total) between Itakpe and Warri. Station Towns include Igbanki, Agenebode, Uromi, Agbor, and Abraka.

The Line is now being envisioned as the Central Line of the National Standard Gauge Rail, complementing the other 3 lines planned:

Western Line – Lagos-Kano (Lagos-Ibadan leg currently under construction; Abuja-Kaduna spur line completed)

– Eastern Line – Port Harcourt-Maiduguri

– Coastal Line – Lagos-Calabar

(adsbygoogle = window.adsbygoogle || []).push({});

The total length of the Itakpe-Warri line is about 327 km: about 50km between Itakpe and Ajaokuta, and 277km between Ajaokuta and Warri. There are future plans to extend it to Lokoja, and then to Abuja, where it will link up with the Abuja-Kaduna Rail. When this is done, it will mean that you can travel by standard gauge rail from the Niger Delta all the way into the heart of Northern Nigeria.

The Rail system is designed to run at speeds between 120 and 150km/hour, meaning that it will be possible to cut travel time between Warri and Lokoja by half.

__________________________ Join us on WhatsApp ______________________________
FADAKA LOUIS

Recent Posts

  • Fashion & Lifestyle

Big perfume brands eye Nigerian market

The perfume industry in Nigeria has continued to grow with potential, exhibiting a similar trend to the global perfume market,…

27 April 2024
  • Entertainment

What Tems did for Young Artists – Tyla

Grammy-winning South African singer Tyla has commended her Nigerian counterpart, Tems, for paving the way for young African female artists…

27 April 2024
  • Entertainment

What I can never do to promote my music – Ice Prince

Nigerian singer and rapper, Ice Prince, has said that he would never pull a stunt to promote his music. Prince…

27 April 2024
  • Entertainment

Funke Akindele Announces New Film

Actress and movie producer Funke Akindele has announced her upcoming project, ‘Everybody Loves Jenifa,’ as part of the popular #Jenifa…

27 April 2024
  • Entertainment

Why Davido, Wizkid, Burna Boy rarely do ‘collabo’

Asa Asika, the manager of Grammy-nominated singer Davido, has explained why his boss rarely collaborates with Wizkid and Burna Boy.…

27 April 2024
  • Entertainment

Rihanna: I regret exposing my body that way

Renowned Barbadian singer, Robyn Rihanna Fenty aka Rihanna has discussed her regrets regarding past nude fashion choices and the impact…

27 April 2024